Location:Boggabilla, NSW, Aus Client: Fulton Hogan Scope: Installation of 1300m of RCP Pipe, construction of RCP and RCBC culverts, installation of pre-cast headwalls, and construction of in-situ culvert base slabs, headwalls and wingwalls. Duration:4 months