Transmission Gully Drainage

Project Title: Transmission Gully Drainage
Client: CPB-HEB J.V.
Location: Eastern Porirua, Wellington, NZ
Duration: 24 Months
Scope:

Silverstrand were engaged by CPB-HEB J.V. to undertake the installation of the transverse drainage as part of the 27km four lane Transmission Gully Motorway project.

    Scopes of work included:
  • Supply of all labour, tools, plant and equipment;
  • Survey of works;
  • Construction and maintenance of access roads;
  • Installation of temporary stream diversions;
  • Excavation, installation and backfilling of 10km + of 300mm dia to 2400mm dia HDPE & RCP pipes;
  • Electrofusion welding of HDPE pipes;
  • Placement of geotextiles;
  • Installation of pre-cast manholes, headwalls and pits; and
  • Installation of rock protection and rip-rap.
   

< Go Back

Australian Projects

Silverstrand are committed to providing a quality service in civil construction specialising in major civil works. Our past experience coupled with our team of qualified personnel ensures all our projects are completed to a high standard.
 

New Zealand Projects

Silverstrand are committed to providing innovation combined with modern techniques in all aspects of building construction. Past projects have displayed Silverstrand’s ability to achieve this commitment through our team of professionals and skilled tradesmen.